Projects – Kiwi cattle yards

Projects

45 Head Cattle Yard

August 2023

The brief:

Design and install a new set of cattle yards to replace old wooden yards that were removed when building the Otaki to Peka Peka Expressway.

Yards must hold 30 head, have 2 pens, 3 way drafting, a headbail and drenching race with catwalk. Installation on new metal pad. 

Timeframe:

6 Weeks from confirmation of design to completion.

The final result:

45 Head Cattle Yard

January 2023

The brief:

Design and install a new set of cattle yards to replace old wooden yards.

Yards must hold one truck load of animals, have 2 pens, 3 way drafting, a headbail and drenching race with catwalk. Forcing pen and drenching race to have a concrete floor. New metaled entrance way and gates to be installed.

Timeframe:

1 month from confirmation of design to completion.

Design:

3D CAD drawings created.

Progress:

Our team finishing off the concrete pad.

The final result: